欢迎加入阿波洛浴盆-世界领先的卫浴整体解决方案品牌

Small family shower room installation strategy be clear at a glance! -

by:Appollo bath     2021-02-12
As house prices rising, many people feel the huge pressure of life, so, the small family house is the first choice for many young couples. Due to the small family housing area is finite, a lot of people choose to for installation shower room, not only differentiate the independent space that wash bath, also improve the structure of the space. Our country has many residential toilet and bathroom together, especially in the old house before, if you want to change this kind of unreasonable space design, can through the way of shower room is installed to the space division. After installation of the shower room, can be apart from the toilet and bathroom, so it has a separate bath space. In the winter, shower room can have very good heat preservation effect, heat can be gathered together, the shower is not too cold. Installation of shower room is a very meticulous work, installation is bad can cause a lot of trouble, so, before installation shower room, must understand the shower room installation techniques. For installation of shower room should be ready for the necessary installation tools, first of all is to be installed at the bottom of shower room, shower room to at the bottom of the parts together, adjust the level at the bottom of shower room, to ensure that no at the bottom of the water. Shower room is through the inside of the hose to water, so make sure the hose can scale at any time. And then try to do is to try water, water is to ensure that the purpose of water flow and sealing, can be filled with water at the bottom, and put out the water after a period of time. If not installed at the bottom of the well, the water will present a tilt state, if the sealing is not good, the water will seep. The installation of aluminum is also very important, after finished the punch is to install aluminum, use screws to fix aluminum on the wall. Installed after the aluminum glass be fixed work, will put off clamping hole, then use screw fixation. After glass is installed for the installation of pipe jacking, find the corresponding location in the upper part of the fixed glass drilling, and then will be fixed at the top of the glass pipe jacking. Generally installed after will be installed in detail, such as shelf, a door, etc. , shelf installation is very simple, glass shelf or solid wood shelf fixed can. When door installation activities mainly to fasten on hardware, and then adjust the position of the door. Completed the installation of shower room you will find that the toilet is very different, can let some wasted corner to the use of the space, let narrow space for maximum development and utilization.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...