欢迎加入阿波洛浴盆-世界领先的卫浴整体解决方案品牌

The installation of the whole shower room more cumbersome than simple shower room, what are the steps? -

by:Appollo bath     2021-02-04
Bath is people must do things every day, so to build a good environment is important in a comfortable bath. Since the emergence of shower room, then to occupy the area is small, the modelling of independent bath space and rich quickly captured the hearts of people. Have simple shower room also has two whole, economic capacity is relatively good family will choose a more overall shower room, so how to install? Overall shower room installation step 1. Are usually the whole shower room toilet nate and separated from a relatively independent space, first determine the installation position of shower room and shower equipment, pay attention to the wall to see if there is water distribution, punch to avoid; 2. Install the bottom basin. Install the bottom basin assembled in position. Some owners found within the basin after installation, pelvic floor appear water phenomenon, this is because the bottom basin when installed to tilt, so after place, according to the horizontal line check whether the bottom basin level. Adjust well bottom basin after the level of the hoses; 3. After installation of bottom pot, water experiment was carried out, if there is a leak or sewer blocked, timely resolution of the next step of the reentry after installation; 4. If using a sliding door, shower room after water testing and can be installed orbit. To install the rail in the middle of the matrix; 5. Installation of aluminum alloy frame. First the edge material card into the upper and lower guide rail, guide rail and edge material with screw locking. Will rely on a wall of aluminum into the left and right sides of the edge material, and placed in the middle of the groundmass is assembled shower room frame, adjust the horizontal position. In an opening in a wall aluminum marked the metope of the corresponding position, using electric drill hole the tag. The size of the hole should be slightly larger than the diameter of the bolt or, and the number of the bolt type. Aluminum alloy frame with fastening screw finally will lock on the matrix. Now a lot of manufacturers in order to look good, also is equipped with the adornment of the fastening screw cap, fitted with the integral style of the decoration cover after more coordination; 6. Fixed on the back of the bottom of basin back and shower panel, and then use stainless steel screws on both sides of the stator; 7. Embedding seals on both sides of the glass and frame, the connection of the margins of society will be toughened glass clamp, lock hole position in the bottom pot; 8. Install the sliding door and shake handshandle, assembled roof and glass glue sealing side; 9. Access to the cold and hot water pipe and water testing water supply is normal; 10. Connect the pipe. Inserted into the pipe and glass glue will apertures of the peripheral seal, waterproof test again, if there is no leaking, jam phenomenon, even if successful installation.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...